* feat(docs): add CI/CD fix validation documentation * chore: trigger workflow with updated quality gates
2.3 KiB
CI/CD Fix Validation
This file validates that the multi-line PR body fix is working correctly.
Issue Fixed
Problem: The pr-into-dev.yml workflow was failing with exit code 127 when checking for linked issues because the PR body variable was not properly quoted, causing bash to interpret multi-line content as commands.
Solution: Changed from storing PR body in a variable to writing it to a temporary file using heredoc (<< 'EOF'), which safely handles multi-line content with special characters.
Test Validation
✅ Fix Committed: Multi-line PR body handling implemented ✅ Branches Updated: Fix applied to main, dev, and feature branches ✅ New Test PR: This PR validates the fix works correctly
Expected Results
When this PR is created targeting dev:
-
Validate PR Structure job should:
- ✅ Pass fork safety check
- ✅ Validate branch name (feature/test-ci-fix-validation)
- ✅ Validate PR title (Conventional Commits format)
- ✅ Check for linked issues (should pass without exit code 127)
-
Quality Gates job should:
- ✅ Run Python validation (skip if no .py changes)
- ✅ Run Markdown linting (this file should validate)
- ✅ Run secret scanning (should pass)
-
PR Summary job should:
- ✅ Generate summary of all checks
- ✅ Show all checks passed
Validation Criteria
- Feature branch created from dev
- Committed with Conventional Commits format
- Pushed to GitHub
- PR created to dev
- pr-into-dev.yml workflow triggered
- All validation steps passed (including linked issues check)
- Quality gates executed successfully
- PR ready for merge (testing only, will close after validation)
Multi-line Content Test
This PR body contains:
- Markdown formatting
- Special characters like
backticks - Mentions of workflow files like pr-into-dev.yml
- Checkboxes and lists
- Code blocks
All of this content should be handled correctly by the fixed workflow.
Cleanup
After validation:
- Close PR without merging (fix is already in dev/main)
- Delete feature branch
- Document successful validation
Date: 2025-11-12 Purpose: Validate multi-line PR body fix in CI/CD workflows Status: Testing in progress Related PR: #3 (original test that revealed the issue)