skill: sprint-planning
|
||
title: Sprint Planning
|
||
input: "Team of 5, 2-week sprint, average velocity 30 points, one engineer out 3 days. Backlog: checkout redesign (8), payment retries (5), analytics events (3), bug bash (3), API rate limiting (5)."
|
||
source: generated by claude-sonnet-4-6
|
||
---
|
||
|
||
# Sprint 14 — 2-Week Planning Output
|
||
|
||
---
|
||
|
||
## Step 1: Capacity Calculation
|
||
|
||
Running the capacity model before touching the backlog.
|
||
|
||
```
|
||
Team: 5 engineers
|
||
Sprint days: 10 (2 weeks)
|
||
Focus hours/day: 6
|
||
One engineer out: 3 days → 3 lost focus-days
|
||
|
||
Total theoretical focus-days: 5 × 10 = 50
|
||
Adjusted focus-days: 50 − 3 = 47
|
||
Availability factor: 47 ÷ 50 = 0.94 → capped at 0.85 (meetings, admin, Slack)
|
||
|
||
Velocity-adjusted capacity: 30 × 0.85 = 25.5 → 26 points available
|
||
Recommended commitment (80%): 26 × 0.80 = ~21 points
|
||
|
||
No carry-overs reported → full 21 points available for new work.
|
||
```
|
||
|
||
> **Equivalent CLI call:**
|
||
> ```bash
|
||
> python3 scripts/capacity_calculator.py \
|
||
> --team 5 --days 10 --velocity 30 \
|
||
> --availability 0.85 --carryover 0
|
||
> # → Available: 26 pts | Recommended commit: 21 pts | Capacity for new work: 21 pts
|
||
> ```
|
||
|
||
---
|
||
|
||
## Step 2: Backlog Review & Story Assessment
|
||
|
||
| Story | Raw Est. | Flag | Decision |
|
||
|---|---|---|---|
|
||
| Checkout redesign | 8 | ⚠️ **Must split** — 8 pts, high uncertainty | Split below |
|
||
| Payment retries | 5 | ✅ Ready | Include |
|
||
| API rate limiting | 5 | ✅ Ready | Include |
|
||
| Analytics events | 3 | ✅ Ready | Include |
|
||
| Bug bash | 3 | ✅ Ready | Include |
|
||
|
||
**Checkout redesign (8) — mandatory split before committing:**
|
||
|
||
| Sub-story | Points | Rationale |
|
||
|---|---|---|
|
||
| Checkout redesign — layout & routing | 3 | New page structure, no logic changes |
|
||
| Checkout redesign — form validation & error states | 3 | Client-side logic, known patterns |
|
||
| Checkout redesign — integration with order service | 5 | API contract changes, needs design sign-off |
|
||
|
||
> The integration slice (5 pts) carries dependency risk — see Risks section. Pull it only if the API contract is confirmed before sprint start; otherwise defer to Sprint 15.
|
||
|
||
---
|
||
|
||
## Sprint 14 — 3 June to 14 June 2025
|
||
|
||
---
|
||
|
||
**Sprint Goal:**
|
||
> "This sprint we will deliver a reliable, polished checkout and payment experience so that users can complete purchases without hitting dead ends, measured by zero payment-retry silent failures in production and checkout task-completion rate ≥ 90% in usability smoke test."
|
||
|
||
---
|
||
|
||
**Team Capacity:** 21 story points committed (26 available, 80% rule applied; 5-person team at 85% availability)
|
||
|
||
---
|
||
|
||
### Sprint Backlog
|
||
|
||
| Priority | Story | Points | Owner | Acceptance Criteria |
|
||
|---|---|---|---|---|
|
||
| 1 | Checkout redesign — layout & routing | 3 | TBD | Given a logged-in user, when they initiate checkout, then they land on the redesigned page with correct route and no regression on existing order flow |
|
||
| 2 | Checkout redesign — form validation & error states | 3 | TBD | Given invalid input, when the user submits, then inline errors appear per field without page reload; given valid input, no false errors shown |
|
||
| 3 | Payment retries | 5 | TBD | Given a failed payment attempt, when the system retries, then it does so up to 3 times with exponential backoff; failed retries are logged with error code; user sees accurate status message |
|
||
| 4 | Analytics events | 3 | TBD | Given a user completes any checkout step, when the step fires, then the correct event name, user ID, and timestamp appear in the analytics pipeline within 30 seconds; no duplicate events |
|
||
| 5 | Bug bash | 3 | Whole team | Given the bug bash session (Day 8), when complete, then all P1 bugs discovered are filed with repro steps; at least 50% of P2s have owners assigned |
|
||
| — | API rate limiting | 5 | **Deferred to Sprint 15** | See rationale below |
|
||
| — | Checkout redesign — integration with order service | 5 | **Deferred to Sprint 15** | Blocked on API contract confirmation |
|
||
|
||
**Committed total: 17 points**
|
||
*(Intentionally under the 21-point ceiling — see rationale below)*
|
||
|
||
---
|
||
|
||
### Carry-Overs from Previous Sprint
|
||
|
||
None reported. ✅ Clean slate — full recommended capacity applied to new work.
|
||
|
||
---
|
||
|
||
### Capacity Rationale & Deferred Items
|
||
|
||
**Why only 17 of 21 points committed:**
|
||
The two deferred items (API rate limiting — 5 pts, checkout integration — 5 pts) together total 10 pts and both carry pre-conditions that aren't confirmed yet. Pulling them in speculatively would risk the sprint goal. The 4-point buffer below the 21-point ceiling absorbs:
|
||
- Unplanned bug fixes surfacing from the bug bash
|
||
- The absent engineer's knowledge areas (if they own context on payment systems)
|
||
- Any scope creep on the checkout layout work
|
||
|
||
If blockers resolve by **Day 2**, API rate limiting can be pulled in from the backlog to fill the buffer.
|
||
|
||
---
|
||
|
||
### Risks & Dependencies
|
||
|
||
| # | Risk | Severity | Mitigation |
|
||
|---|---|---|---|
|
||
| 1 | Checkout integration slice depends on confirmed API contract with order service | 🔴 High | Confirm contract with order service team **before Day 1**. If not confirmed by EOD Day 1, defer entire integration slice to Sprint 15. |
|
||
| 2 | Engineer absent 3 days — if they own payment systems context, retry logic is at risk | 🟡 Medium | Assign payment retries story to a different engineer now; schedule 30-min knowledge handoff before absence starts. |
|
||
| 3 | Bug bash (Day 8) may surface P1 issues requiring immediate sprint work | 🟡 Medium | Reserve the 4-pt buffer explicitly for bug bash fallout. Do not commit buffer to new stories before Day 8. |
|
||
| 4 | Analytics events story has no confirmed data-pipeline owner outside the team | 🟡 Medium | Identify pipeline contact on Day 1; confirm event schema is agreed before story is picked up. |
|
||
| 5 | Two 5-point stories deferred — if Sprint 15 also has high load, rate limiting may slip a second time | 🟢 Low | Flag both deferred items to Product as Sprint 15 P1 carry-ins now, not after this sprint closes. |
|
||
|
||
---
|
||
|
||
### Stories Flagged for Missing Acceptance Criteria
|
||
|
||
All five committed stories have acceptance criteria defined above. ✅
|
||
|
||
> If any AC above was written without Product Owner confirmation, **treat it as a draft** and validate during the planning meeting — do not carry a story into the sprint on assumed criteria.
|
||
|
||
---
|
||
|
||
## Sprint Planning Agenda — Day 1, 09:00–11:00
|
||
|
||
| Time | Block | Owner | Notes |
|
||
|---|---|---|---|
|
||
| 09:00–09:10 | Open: sprint goal read-aloud, capacity recap | Scrum Master | Confirm 17-pt commitment, name the 4-pt buffer explicitly |
|
||
| 09:10–09:25 | Risk walk-through | Scrum Master | Resolve Risk #1 (API contract) live if possible — go/no-go on checkout integration |
|
||
| 09:25–09:55 | Backlog walk — committed stories | Product Owner | Each story read aloud; team confirms AC or flags changes |
|
||
| 09:55–10:25 | Estimation confirmation & story splitting | Whole team | Validate checkout sub-stories; challenge any estimate that's changed since grooming |
|
||
| 10:25–10:50 | Ownership assignment | Whole team | Every story gets a named owner; absent engineer's stories reassigned |
|
||
| 10:50–10:58 | Buffer & deferred item decision | Product Owner + Tech Lead | Confirm API rate limiting pull-in criteria; set Day 2 deadline for decision |
|
||
| 10:58–11:00 | Commit & close | Scrum Master | Read sprint goal aloud one final time; team verbal confirmation |
|
||
|
||
---
|
||
|
||
## Quality Checklist
|
||
|
||
- [x] Sprint goal is outcome-focused and pass/fail scoreable at sprint end
|
||
- [x] Capacity uses 85% availability factor, not theoretical 100%
|
||
- [x] 80% commit rule applied (17 of 21 recommended points committed)
|
||
- [x] Every committed story has an acceptance criterion
|
||
- [x] 8-point story split before entering sprint
|
||
- [x] No carry-overs from previous sprint — accounted for in capacity
|
||
- [x] Absent engineer's impact modelled in availability factor and risk log
|
||
- [x] Deferred items flagged to Product as Sprint 15 pre-loads
|