f3b9d008fe
New skills added: - teaching-lesson-plan: structured lesson plans for any subject/audience/setting - seo-content-brief: complete SEO briefs with intent, competitor gaps, and outline - media-pitch: story-first journalist pitches with angle development framework - change-management-plan: stakeholder analysis, comms strategy, adoption metrics - workshop-facilitation-guide: activity instructions, decision protocols, facilitator moves - sales-forecasting-model: pipeline model, scenario analysis, assumption log - tax-planning-checklist: year-end tax planning across income, pension, CGT, reliefs Quality improvements across all 93 existing skills: - Standardised description format: "Verb the thing. Use when X. Produces Y." - Added Required Inputs section to all skills missing it (prompts for missing info) - Added Quality Checks section to all skills missing it (specific, not generic) - Fixed broken multiline YAML descriptions - Removed non-standard frontmatter keys (tool_integration, metadata blocks) README updated to v6.0.0 with 100-skill count, new skill tables, and article series Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
126 lines
4.7 KiB
Markdown
126 lines
4.7 KiB
Markdown
---
|
||
name: product-launch-checklist
|
||
description: "Generate a comprehensive pre-launch, launch day, and post-launch checklist for any product release. Use when preparing for a product launch, feature release, or major update. Produces a role-assigned, tiered checklist covering engineering readiness, marketing and comms, support, and post-launch monitoring."
|
||
---
|
||
|
||
# Product Launch Checklist Skill
|
||
|
||
Never launch without checking everything. Generate a complete, role-assigned checklist covering pre-launch readiness, launch day execution, and post-launch monitoring.
|
||
|
||
## How to Use This Skill
|
||
|
||
Provide:
|
||
- Launch name and date
|
||
- Launch tier (1 = major, 2 = feature, 3 = incremental)
|
||
- Team members and their roles
|
||
|
||
The skill generates a tiered checklist. Tier 3 launches use only the Essentials section. Tier 2 adds Marketing & Comms. Tier 1 uses all sections.
|
||
|
||
---
|
||
|
||
## Output Format
|
||
|
||
### Launch Checklist — [Feature/Product Name] — Target Date: [Date]
|
||
|
||
**Launch Tier:** [1 / 2 / 3]
|
||
**Launch Owner:** [PM Name]
|
||
**Engineering Lead:** [Name]
|
||
**Go/No-Go Decision By:** [Date and time — typically 24 hours before launch]
|
||
|
||
---
|
||
|
||
### 🔧 PRE-LAUNCH — Engineering & Product (T-2 weeks)
|
||
- [ ] Feature flag created and tested in staging
|
||
- [ ] All acceptance criteria signed off by PM
|
||
- [ ] Code reviewed and merged to main
|
||
- [ ] QA sign-off completed (regression + new feature)
|
||
- [ ] Performance testing completed (load, latency)
|
||
- [ ] Security review completed (if data or auth changes)
|
||
- [ ] Rollback procedure documented and tested
|
||
- [ ] Monitoring and alerting configured
|
||
- [ ] Error logging in place with correct severity levels
|
||
- [ ] Database migrations tested on staging with production data volume
|
||
|
||
### 📢 PRE-LAUNCH — Marketing & Comms (T-1 week)
|
||
- [ ] Blog post written, reviewed, and scheduled
|
||
- [ ] In-app announcement or tooltip configured
|
||
- [ ] Email campaign drafted and QA'd
|
||
- [ ] Social media posts drafted and scheduled
|
||
- [ ] Landing page or feature page live in staging
|
||
- [ ] Press outreach sent (Tier 1 only)
|
||
- [ ] Product Hunt / community posts prepared (Tier 1 only)
|
||
|
||
### 🎓 PRE-LAUNCH — Sales & Support (T-1 week)
|
||
- [ ] Sales enablement one-pager completed
|
||
- [ ] FAQ document shared with sales and support teams
|
||
- [ ] Help centre articles written and published
|
||
- [ ] Support team demo / training completed
|
||
- [ ] Customer success team briefed on top accounts
|
||
- [ ] Pricing updated (if applicable)
|
||
- [ ] Contracts / ToS updated (if applicable)
|
||
|
||
### 📊 PRE-LAUNCH — Analytics (T-1 week)
|
||
- [ ] Analytics events firing correctly in staging
|
||
- [ ] Dashboard configured for launch metrics
|
||
- [ ] Baseline metrics documented
|
||
- [ ] Success criteria documented and shared with team
|
||
- [ ] A/B test configured (if applicable)
|
||
|
||
---
|
||
|
||
### ✅ GO / NO-GO DECISION — T-24 hours
|
||
|
||
| Criteria | Status | Owner |
|
||
|---|---|---|
|
||
| All critical bugs resolved | 🟢 / 🔴 | Eng Lead |
|
||
| QA sign-off complete | 🟢 / 🔴 | QA |
|
||
| Rollback tested | 🟢 / 🔴 | Eng Lead |
|
||
| Help centre articles live | 🟢 / 🔴 | Support |
|
||
| Monitoring active | 🟢 / 🔴 | Eng Lead |
|
||
| PM sign-off | 🟢 / 🔴 | PM |
|
||
|
||
**Go / No-Go Decision:** [GO / NO-GO]
|
||
**Decision Owner:** [PM + Eng Lead jointly]
|
||
|
||
---
|
||
|
||
### 🚀 LAUNCH DAY
|
||
- [ ] Feature flag enabled for [X%] of users (start low — 5–10%)
|
||
- [ ] Launch confirmed in team Slack/channel
|
||
- [ ] Metrics dashboard open and being monitored
|
||
- [ ] Error rate checked at T+15 min, T+1 hr, T+4 hr
|
||
- [ ] Blog post published / email sent
|
||
- [ ] Social posts live
|
||
- [ ] Support team on standby for first 4 hours
|
||
- [ ] PM available and reachable all day
|
||
- [ ] Feature flag expanded to 50% if T+2hr checks pass
|
||
- [ ] Feature flag expanded to 100% if T+4hr checks pass
|
||
|
||
---
|
||
|
||
### 📈 POST-LAUNCH (D+7, D+30)
|
||
- [ ] D+7 metrics review: adoption, errors, support tickets
|
||
- [ ] D+7 customer feedback synthesised
|
||
- [ ] Retrospective scheduled
|
||
- [ ] Learnings documented
|
||
- [ ] D+30 success metrics reviewed against targets
|
||
- [ ] Feature flag removed from codebase (clean up)
|
||
- [ ] Follow-up features added to backlog based on feedback
|
||
|
||
---
|
||
|
||
## Quality Checks
|
||
|
||
- [ ] Launch tier confirmed before generating checklist (scope determines depth)
|
||
- [ ] Go/No-Go decision has a named owner and a specific decision time
|
||
- [ ] Rollback procedure is documented and tested (not just planned)
|
||
- [ ] Feature flag expansion is staged (5% → 50% → 100%), not all-at-once
|
||
- [ ] Post-launch retrospective is scheduled at launch time
|
||
|
||
## Guidelines
|
||
|
||
- The Go/No-Go decision must have a named owner — "the team" is not an owner
|
||
- Never launch on a Friday unless you have weekend engineering coverage
|
||
- Recommend starting all launches at <10% traffic — even for simple features
|
||
- Document rollback time: "We can revert this in X minutes" should be known before launch
|